
Work began in the front yard on February 1st. Jacob and Mark worked on digging the footings for the new walls to be built for the new master bath and front porch. Mr. T even stopped by last Saturday to assist with the wood placements to ensure everything was on the right track.
(Master Bath Ready for Inspection)
Only one hiccup so far! Mark cut through our main water pipe thinking it was the sprinkler system. Luckily, Mr. Plumber Man made it out in a couple hours to get us running water again.
(Oops!)




Post a Comment